Conceptual Facility Cost Planning
Job name not set
School and location will appear here.
Premium budgeting tools for athletic facility construction.
This estimator now follows the same SCG Fields visual language as the Field Builder, while keeping the workbook-based pricing logic and editable planning assumptions underneath.
Field Area
120,000 SF
Perimeter
1,300 LF
Conceptual Estimate
Baseball - synthetic turf
$0
Likely Planning Range
$0 - $0
Cost / sqft range
$0 - $0
Included Items
0
Add options
$0
Direct construction$0
OH&P$0
Bond / TIPS$0
Add alternates$0
Items needing review0
Estimate Breakdown
Use this as the website visitor summary, or expand it later into a lead-capture workflow with protected pricing tables behind the same interface.
Facility Type
Baseball
Surface
Synthetic turf
Scope
New field construction
Regional Factor
1.00x
Planning-level estimate only. Final pricing still requires site investigation, design development, and current subcontractor or vendor pricing.
Imported Designer Files
The 2D layout and dimension report came across from Facility Designer with this estimate.
Estimated Line Items
Highest-cost items are shown first. Uncheck any item to remove it from pricing.